- Contracting with multiple subcontractors
- Accounting management
- On-site management
- Insurance risk/exposure
- Excessive construction cycle times
- Quality control issues
- Job site theft
- Disorganized & hazardous job-site conditions
- Low overall customer satisfaction

The problem with traditional construction
Industry waste & bottlenecks
- Great difficulty finding qualified & skilled labor
- Critical lack of skill sets
- Paying more to poach skilled trade workers
- Driving industry prices upward
- High insurance costs
- Very little cross trade coordination & planning
- Inclement weather delays
- Material theft
- Inconsistent pricing
- Unreliable scheduling
- Additional interest expense
- Materials waste
- Excessive waste handling
- Skyrocketing labor wages
- 250,000 open jobs per month
- Lower profit from operations
- Low Buyer Loyalty
What we do differently
We engage technology to manufacture and install “white label” framing packages for general contractors and home builders, (complete with M.E.P’s). This provides a scalable, consistent product that far surpasses the quality of traditional site-built framing packages and significantly reduces construction cycle time.
We can manufacture the equivalent of 1.5M sq. ft. of homes annually with a production staff of 42 people!


Framing panels with mechanical, electric, and plumbing rough-in improvements pre-installed.
Automating The Home Building Experience

Plans are drawn in 3D to produce files and data which are then used by CNC Saws and Wall/Floor Assembly Systems. The manufacturing process is plan-driven, enabling us to build multiple products on each line.

By combining robotic material processing with semi automatic assembly, Occam eliminates an average of 105-man hours from a process which requires 292-man hours to complete using traditional site-built processes.

Occam Off-Site components are fitted with all plumbing, electric and H.V.A.C. rough-in materials in place. Final connections are made after components are hoisted, placed and secured. Homes/Apartments are “dried-in” and ready for code compliance inspections in days or weeks, not weeks or months.

A framing package for an average size home can be assembled on-site and “dried-In” in just two working days. Garbage hauling and on-site supervision costs are significantly reduced.